Karnataka Power Corporation Limited - Karnataka

40000716 dismantling and re installation of the existing fire alarm system and cctv networking system of ucb 2, 3 and 4 and dismantling of fire suppression system of ucb 2, 3 and 4 at rtps...

Department of Defence Production - Karnataka

39906732 bids are invited for fire suppression system item sl no1 fire supression system as per sl no1 of tech specification item sl no2 fire supression system as per sl no2 of tech specification item sl no3 fire supression system as per sl no3 of tech specification item sl no4 fire supression system as per sl no4 of tech specification item sl no5 fire supression system as per sl no5 of tech specification item sl no6 fire supression system as per sl no6 of tech specification total quantity : 69...

South Western Railway - Karnataka

39888515 supply of heat cum smoke detector as per technical spec. mentioned below. operating voltage:9 33v, dc stand by current: 50 ua. startup time: 60sec, startup current: 170 ua. alarm current: 90ma ( max ) thermal rating: 59c ( 138f ) , rate of raise of temperature: 11.1c / min ( 20f / min ) , smoke sensitivity: ( 1.9 + 0.76 ) % / ft, operating temperature: 100c to 37.80c, storage temperature: 100c to 600c, humidity: 0 95%rh, non considering cycle time: 5sec. make: ravel or system sensor or apollo or agni suraksha only. note: 1. the subject item should be compatible with fire suppression used in ir coaches. note: 2. sample to be approved by consignee before bulk supply [ warranty period: 30 months after the date of delivery ] => limited...

Nmdc Limited - Karnataka

39753107 bids are invited for automatic fire suppression system ( afps ) for hem total quantity : 25...

South Western Railway - Karnataka

39644976 supply and installation of set of aerosol fire detection & suppression system consisting of fire suppression system cartridges of 100g 2 no.s, sensing cable 2 no.s, actuating device 2 no.s, as per the technical requirement specified in the annexure specified in the annexure g1 of spec no rdso / pe / spec / ac / 0192 2018 ( rev 1 ) . this shall be installed in sbc of lhb ac coaches & lwlrrm. all modifications, back pieces, installation brackets & accessories required for installation of this item shall be within the...

Department Of Space - Karnataka

39428358 bids are invited for fixed clean agent gas based cylinderless fire suppression system (q2) total quantity : 15...

South Western Railway - Karnataka

39192240 supply of nitrogen gas cylinder ( capacity 50 ltr ) for automatic fire detection cum fire suppression system in lhb coaches.detailed specifications enclosed make: sanrok or equivalent [ warranty period: 30 months after the date of delivery ] ...

Department of Defence Production - Karnataka

38020672 bids are invited for system for server rack co2 gas fire suppression 2 kg 10 mtr , co2 gas fire suppression 2 kg 20 mtr , co2 gas fire suppression 5 kg 10 mtr clean agent gas based cylinder less fire suppression co2 total quantity : 7...

Ministry Of Railways - Karnataka

37996850 bids are invited for galvanized mild steel fire bucket (fire suppression hand tools) as per is 2546 (q3) total quantity : 126...

Indian Army - Karnataka

37580381 bids are invited for galvanized mild steel fire bucket (fire suppression hand tools) as per is 254 (q3) , fire beaters (fire suppression hand tools) (q3) , fire hooks (fire suppression hand tools) (q3) total quantity : 6...

South Western Railway - Karnataka

37159409 supply of charging unit to sanrok part no 2ed 254 1939 and as per specification rdso / 2013 / cg 06 rev 00 for automatic fire suppression system [ warranty period: 30 months after the date of delivery ] ...

Airports Authority Of India - Karnataka

36542689 bids are invited for 1 supplying, installation and testing and commissioning of 80 litre capacity, seamless, high pressure, cylinder assembly, conforming to is 7285 ( pt 2 ) : 2004 or ul 2166 etc. complete as required including valve, bracket assembly, pressure gauge and 2 inch flexible discharge hose etc. complete as required. each 1 2 supplying, installation and testing and commissioning of 34 litre capacity, seamless, high pressure, cylinder assembly, conforming to is 7285 ( pt 2 ) : 2004 or ul 2166 etc. complete as required including valve, bracket assembly and 2 inch flexible discharge hose etc. complete as required. each 1 3 supplying and filling of clean, odourless, colour less, ul listed and suitable for fire class a, b & c fire suppression agent ( novec 1230 fire protection fluid ) etc. complete as required. kg 70 4 supplying, installation, testing and commissioning of 24 v dc, electric actuator and local / manual pneumatic actuator for triggering the cylinder assembly etc. complete as required. set 2 5 supplying, installation, testing and commissioning of low pressure switch for the cylinder assembly etc. complete as required. each 2 6 supplying, installation, testing and commissioning of manual gas release station etc. complete as required. each 2 7 supplying, installation, testing and commissioning of manual gas abort station etc. complete as required. each 2 8 supplying and fixing of suitable size ( as per hydraulic flow calculation ) nozzle with orfices etc. complete as required. each 4 9 supply and laying of ms pipe ( m.s. seamless to astm a 106, sch. 40 ) red painted with all fittings & supports, etc. on surface / recess / above false ceiling / concealed space / wall concealed complete as required as per site requirement. lot 2 10 supply, installation, testing & commissioning of ul / en listed ( latest version ) modular microprocessor based expandable intelligent addressable type fire alarm control panel with gas release module of two loops, with minimum 320 character graphics / lcd display with touch screen or other keypad and minimum 4000 events history log in the non volatile memory ( eprom ) , the panel should be equipped with loop capacity to take minimum 240 intelligent addressable detectors / devices ( in any combination ) in one loop. four access levels, capable of taking protocol devices, graphical display, sufficient numbers of programmable relay controls for controlling ventilation fan, fire pump room, monitoring of fire sprinkler and fire hydrant pump, 230 volts, 50 hz ac power supply, automatic battery charger, 24 volts sealed maintenance free lead acid batteries sufficient for 2 hours normal working and then be capable of operating the system for 30 minutes during an emergency / fault conditions along with battery stand as required. the panel shall have facility for seamless integration with pa system ( for giving trigger signal to start pre recorded digital voice evacuation from pa system in case of fire ) . the panel shall be compatible for building management system with open protocol bacnet / modbus etc. as per specification, complete as required. job 1 11 supply, installation, testing & commissioning of ul / en listed ( latest version ) intelligent addressable multi criteria detector { smoke + heat } with inbuilt fault isolator / isolator base and with unique optical sensing chamber, visible led, fully coated circuit board, superior rf / transient protection suitable for 2 wires loop connection, complete with plug into common separate base & housing constructed of lexan ( or polycarbonate ) complete with connections etc. as required and to be installed below / above false ceiling roof and concealed space and as per enclosed specifications , complete as required. ( cost of plug in common base shall deemed to be included in cost of detectors ) each 12 12 supply, installation, testing and commissioning of ul / en listed ( latest version ) response indicators for getting fire indications of detectors i / c mounting boxes installed above false ceiling area interconnecting to loop cable etc. as per specification complete as required. each 6 13 supply, installation, testing & commissioning of ul / en listed ( latest version ) intelligent addressable manual call station ( resettable pull / push type ) suitable for semi flush mounting, ip 54 with inbuilt fault isolator / isolator module with double gang outlet box, equipment for key operated test reset lock, electronic or rotary switches for address setting. manual pull station shall be connected with two wire to slc loop of fire control panel. cover shall be made out of lexan ( or polycarbonate equivalent ) with clear operating instruction and the word fire appearing on the front complete with connections etc. as required and as per enclosed specifications. each 2 14 supply, installation, testing and commissioning of ul / en listed ( latest version ) loop powered addressable hooter cum strobe with inbuilt fault isolator / isolator module with adjustable sound level in the range of min. 90 db to max. 120 db at 1m distance complete with termination etc. as required and as per enclosed specification. each 2 15 supply, installation, testing and commissioning of conventional fire alarm control panel having minimum of 2 zones suitable for connecting sensors, manual call points, hooters and response indicators operation on 230 volts, 50 hz power supply, lcd display to indicate fire and normal operation & power supply status, push button for accept and reset, sealed lead acid batteries with minimum 24v dc backup on alarm mode & normal operation mode with battery charger etc., shall be complete as required. panel shall have necessary provision for connecting and functioning with auto dialler etc as required. ( make: as per aai approved makes list ) each 1 16 sitc of auto dialler with landline dialler capability complete with all necessary accessories including connections etc. as required. each 1 17 supply & fixing of indoor manual call point complete with all accessories including connections of etc. as required. ( as per approved makes list ) each 1 18 sitc of hooter with base plate etc as required. ( as per approved makes list ) each 1 19 supply & fixing of conventional type photoelectric, multi sensor smoke detectors along with mounting base with unique optical sensing chamber, visible leds fully coated circuit boards with rf / transient protection, complete with all accessories including connections etc. as required. ( as per approved makes list ) each 2 20 supply and laying of ms steel conduits isi marked red painted with all fittings and saddles for drawing detector control cables on surface / recess / above false ceiling / concealed space / wall concealed, etc of following sizes: 20 mm mtr 150 21 supply and laying of following size pvc insulated frlsh 2cx2.5sq.mm copper conductor cable through conduits / surface / recess / above false ceiling / concealed space / wall concealed, etc. for control cabling for fire detection & alarm devices and interconnecting etc as required. ( as per approved makes list ) mtr 150 22 supply and installation of fire bucket stand with canopy consisting of 04 no’s of buckets, fire bucket stand made of angle iron size 40 x 40 x 6mm having arrangement for hanging of 04 nos. bucket on suitable hooks made of ms round bar, the stand should be painted with post office red enamel paint, fire bucket of size 11x40x8 high top bottom duly painted by post office red enamel paint outside and white enamelled paint in inner side with mark... total quantity : 421...

Ministry Of Railways - Karnataka

36353822 bids are invited for galvanized mild steel fire bucket ( fire suppression hand tools ) as per is 2546 ( q3 ) mse total quantity : 98...

Ministry Of Railways - Karnataka

36336951 bids are invited for galvanized mild steel fire bucket ( fire suppression hand tools ) as per is 2546 ( q3 ) mse total quantity : 126...

South Western Railway - Karnataka

35710873 supply of main control unit drg.no. 2ed 245 1902 / a for manual fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) as per rdso specn rdso / 2013 / cg 06 rev.02 along with authorized test certificate and guarantee certificate of 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later.main control unit drg.no. 2ed 245 1902 / a for manual fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) as per rdso specn rdso / 2013 / cg 06 rev.02 along with authorized test certificate and guarantee certificate of 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later., main control unit drg.no. 2ed 245 1902 / a for manual fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) as per rdso specn rdso / 2013 / cg 06 rev.02 along with authorized test certificate and guarantee certificate of 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later. [ warranty period: 48 months after the date of delivery ] ...

Indian Air Force - Karnataka

35706338 bids are invited for fire beaters (fire suppression hand tools) (q3) , portable fire extinguishers as per is 15683 (2018) version 2 (q2) , galvanized mild steel fire bucket (fire suppression hand tools) as per is 2546 (q3) total quantity : 784...

South Western Railway - Karnataka

35222444 supply of hose pipe suitable for fitment on adapters / fittings, 10 l according iso 8434 1, length 800 mm end 1:10 l 90 degree , end 2: 10 l 90 degree stainless steel ends v4a, working pressure: 200 bar, burst pressure: 500 bar ( item no 353120 ) hose pipe suitable for fitment on adapters / fittings, 10 l according iso 8434 1, length 800 mm end 1:10 l 90 degree , end 2: 10 l 90 degree stainless steel ends v4a, working pressure: 200 bar, burst pressure: 500 bar ( item no 353120 ) , hose pipe suitable for fitment on adapters / fittings, 10 l according iso 8434 1, length 800 mm end 1:10 l 90 degree , end 2: 10 l 90 degree stainless steel ends v4a, working pressure: 200 bar, burst pressure: 500 bar ( item no 353120 ) for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) along with authorized test certificate and guarantee certificate 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later [ warranty period: 48 months after the date of delivery ] ...

South Western Railway - Karnataka

35222403 supply of manual release valve to part no. b04801208 for manual fire suppression systemmanual release valve to part no. b04801208 for manual fire suppression system, manual release valve to part no. b04801208 for manual fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) along with authorized test certificate and guarantee certificate of 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later [ warranty period: 48 months after the date of delivery ] ...

South Western Railway - Karnataka

35222216 supply of special fittings for gas actuator valve w21 8 x 1 1 / 4special fittings for gas actuator valve w21 8 x 1 1 / 4, special fittings for gas actuator valve w21 8 x 1 1 / 4 including seal and nut out: 10 l according to iso 8434 1 ( m16*1.5 ) inner part: v4a ( medium rated ) outer part: brass nut ( item no. 352254 ) for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) along with authorized test certificate and guarantee certificate 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later [ warranty period: 48 months after the date of delivery ] ...

South Western Railway - Karnataka

35222114 supply of pressure gauge to part no.029720059 for manual fire suppression system of sanrok enterprisespressure gauge to part no.029720059 for manual fire suppression system of sanrok enterprises, pressure gauge to part no.029720059 for manual fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) along with authorized test certificate and guarantee certificate of 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later [ warranty period: 48 months after the date of delivery ] ...

South Western Railway - Karnataka

35222071 supply of automatic fire suppression system pressure gauge to part no.029720182 for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression systemautomatic fire suppression system pressure gauge to part no.029720182 for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system, automatic fire suppression system pressure gauge to part no.029720182 for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) along with authorized test certificate and guarantee certificate 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later [ warranty period: 48 months after the date of delivery ] ...

South Western Railway - Karnataka

35222012 supply of fire rated activation solenoid valve to part no.804390306 for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) fire rated activation solenoid valve to part no.804390306 for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) , fire rated activation solenoid valve to part no.804390306 for automatic fire suppression system of sanrok enterprises manual for fire detection and suppression system manual no. dmm / fdas / 002 rev 01 ( date of issue 01 / 06 / 2020 ) along with authorized test certificate and guarantee certificate of 36 months from the date of fitment commissioning / 48 months from date of supply whichever is later [ warranty period: 48 months after the date of delivery ] ...

Department Of Electronics And Information Technology - Karnataka

34992038 construction &providing complete solution for implementation of basic data centre infrastructure atc dac, bangalore. / construction works 2 earth works 3 plane cement concrete work 4 masonry works 5 reinforced cement concrete works 6 steel fabrication works 7 cenering & shuttering works 8 doors, windows work 9 flooring and cladding works 10 plastering and painting works 11 water proofing works 12 fabrication works including steel and fabrication for pipe bride / pipe rack 13 plumbing work including sanitary fixtures, fitting, tee, elbow etc. 14 external development work including road, gutter, hume pipe etc. 15 landscape works including grass, shurbs, trees with trenching and digging hole in soil for tree and paver blocks etc. 16 office area interior work, furniture work etc. to complete the job. 17 any other item missing to complete the projects including all statutory approvals, equipments foundations etc. ( towards sr. no. 1 building / construction work ) 18 data centre work:bidders to calculate the quantity as per drawing layout, sld, p&id & site visits w.r.t. supply and installation of following items for complete dc solution at c dac, bangalore. 19 ht line work including load sanction of 4760kva , load release, connection from two substation estimate approval from bescom and kptcl , substation modification work like addition of spun poles addition of rmu units and any other work, supply , laying of 11 kv ht cable 3 c 400 sq. mm a2xfy cable round armoured ( estimated length of cable around 1.4 kms from kionics musk and 1.8 kms from velankani muskbut may change bidder to work out ) , cable should be without joint, termination kit , civil work as road crossing, hume pipe, digging etc. approvals if any for road work etc. to complete the job. work to be carried out as per instructions / estimation from local electricity authority ( bescom ) . 20 sitc ( supply, installation, testing and commissioning ) of metering kiosk along with ct pt, meter, 11 kv rmu unit as per local electricity board requirement and approval. civil work if needed as plinth, overhead structure etc will be in bidders’ scope. work to be carried out as per instructions / estimation from local electricity authority ( bescom ) . 21 sitc ( supply , installation, testing and commissioning ) , icog panel , ht panelsalong with 11 kv ht cable from rmu unit to metering kiosk to ht icog panel to ht panels and to transformeralong with termination kit and jointing kit. 22 sitc of 3 x 2500 kva , 11 kv / 433 v distribution transformer with rtcc and oltc. civil work if needed as plinth / foundation, rails, overhead structure etc will be in bidders’ scope. 23 sitc of 7 x 500 kva, ups system along with k4 rated cu winding isolation transformer, li ion battery etc. to complete the job. 24 sitc of 2x 500 kva, ups system along with cu winding isolation transformer, li ion battery etc. to complete the job. 25 sitc of all lt panels , ups outputs panels, rtpfc panels, raw power dbs, ups dbs, synchronisation panel, isolator panels for transformer, chiller, dg sets, dry cooler etc. 26 sitc of 3 x 2250 / 2500 ( prime / standby rating ) kva, 415 vdg sets along with exhaust stack, flasher light , dc supply , lighting arrestor, underground 2 x 25 kl fuel storage tank, fuel pump etc. approvals like ceig, ccoe, peso, scope should include civil work for dg, pump and stack foundation, for fuel storage tank, chain link fencing , water sprinkling system etc.. 27 sitc of sandwich bus duct for internal panel tie breaker, bus bar in data centre area above all pod and above cpu and gpu racks as per electrical sld given. 28 sitc of all cu and al lt cables and wires along with terminations, glands, cable marker etc. 29 internal and external illumination system along with dbs, wiring, switch and socket boards, conduits, galvanised octagon pipes etc. 30 sitc of adiabatic dry cooler along with pressurization tank , expansion tank, fi pumping, air separator , adiabatic water tank chemical dozing unit etc. as per p & id provided 31 sitc of ms c class grooved pipe along withgrooved coupling, gasket, connection bellows, all types of valves, ( motorised and manual ) , end flanges, reducer, expansion joint , pipe insulation, instrumentation etc. to complete the job 32 sitc of air cooled chiller for data center application with low gwp refrigerantalong with pressurization tank , expansion tank, fi pumping, air separator , thermal storage tank, chemical dozing unit etc. as per p & id provided 33 sitc of ms c class grooved pipe along withgrooved coupling, gasket, connection bellows, all types of valves, ( motorised and manual ) , reducer, expansion joint , instrumentation end flanges etc. to complete the job 34 sitc of in rows in pod 1 with containment 35 sitc of in rows in pod 2 with containment 36 sitc of in rows in pod 3 with containment 37 sitc of in rows in pod 4 with containment 38 sitc of rdhxfor cpu+ gpu rack 39 sitc of pac units dx based with odu , cu piping etc. to complete the job 40 sitc of pahu units chilled water based 41 sitc of plate heat exchanger units 42 sitc of cable trays of all size including ss cable trays along with supports, hangers etc. 43 sitc of actuators instrumentation and control for entire cooling system 44 sitc of fire alarm system including detectors, panels, cabling and associated accessories etc. 45 sitc of fire suppression system for data center area including gas release panel, cylinders, manifold, piping, novec gasand associated accessories etc. for ups and battery and data center area 46 sitc of cctv system including camera, switch, nvr, cables, monitors / tv etc. 47 sitc of ibms software includingsystem ( computer, monitor ) integration of third party devices, i / o modules, all control and communication cabling etc. 48 sitc of other ibms including water leak detectors, rodent repellent, vesdawater quality sensor system , door access control system etc. 49 sitc of any other item, material required to complete the solution in adiabatic dry cooler loop 50 sitc of any other item, material required to complete the solution in air cooled chillerloop 51 sitc of any other item, material required to complete the solution in electrical requirement 52 sitc of any other item, material required to complete the solution in i bmsrequirement 53 sitc of raised floor and false ceiling system for data center area , ups and battery room area 54 vrv cooling system in office, meeting room, conference hall etc. 55 utility structural steel required for overhead pipe bridge for piping and for cables. all lt cables coming from transformer yard and dg yard needs to be routed on this pipe rack. 56 any other item missing to complete the project 57 operation and maintenance year 1 58 operation and maintenance year 2 59 optional post warranty items ( these items will not be considered for computing l1. c dac reserve the right towards placement of order for these items. ) ...

Ministry Of Railways - Karnataka

34071542 bids are invited for galvanized mild steel fire bucket (fire suppression hand tools) as per is 2546 (q3) total quantity : 150...